Phase-1 and phase-2 L2 (33u/1.2A aux-buck inductor) sat on 1210 lands, and no stocked 1210 33 uH is rated above 0.5 A. Both now use the manager's part, cjiang FNR5040S330MT (C167973, Isat 1.30 A min), on L_Changjiang_FNR5040S, as an ECO on each routed board: - phase-1: L2 at (32.6, 61.25); the SW_AUX diagonal is re-ended on the new pad and a 0.4 mm F.Cu 5V0 link joins L2's via to C54's. - phase-2: L2 at (68.4, 57.45) r270; its SW_AUX and 5V0 vias now sit in the pads, the two stubs that reached them are gone, and a 0.3 mm stub ties C55's 5V0 via to pad 2. - common/eco_swap_fp.py does the in-place footprint swap (nets, fields and path carried over). sheets_common.py, both gen_board.py PLACEMENT tables and the aux-rails sheets carry the change, so a rebuild matches. - DRC unchanged: phase-1 10 silk warnings, phase-2 19 warnings, 0 errors and 0 unconnected on both. Fab zips, BOMs and CPLs regenerated. The other CHECK rows (stock checked 2026-10-06): - Phase-1 C20/C75-C77: no 22 uF 50 V 1210 is stocked, so the design value is now 10u/50V X7R (~0.3 Vpp input ripple at 8 A, 350 kHz). - Phase-1 Q1-Q4: CSD18563Q5A still out of stock; NTMFS5C670NLT1G stays. Its case 488AA terminals land within 0.14 mm of the TI part's on the Q5A land. - Phase-2 U3: LM5143QRHARQ1 is the LM5143A-Q1, same pin map; RHA0040N matches the RHA0040P land (EP 3.3, 0.5 pitch, 5.8 span). No CHECK row is left in any BOM. INA228AQDGSRQ1 stock is down to 5, now on the order-early list. README, HANDOVER, SOURCING, the build guide and the tools READMEs are updated. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Kap1Vqs6wqd3fshJdnERW7
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Requested by Udara Vimarsha · project thread
Before: Phase-1 and Phase-2 L2 sat on 1210 lands that no stocked 33 µH part can serve above 0.5 A, and four BOM rows were still marked
CHECK:waiting on a decision.After: both L2s use the manager's 5 × 5 mm FNR5040S330MT (C167973, Isat 1.3 A), and no
CHECK:row is left in any BOM.How:
hardware/common/eco_swap_fp.pyswaps a footprint in place, keeping nets and fields. Phase-1: L2 at (32.6, 61.25), SW_AUX stub re-ended on the new pad, a 0.4 mm F.Cu 5V0 link from L2's via to C54's. Phase-2: L2 at (68.4, 57.45) r270, the old SW_AUX/5V0 vias now sit inside the bigger pads, a 5V0 stub to C55's via.sheets_common.py, bothgen_board.pyPLACEMENT tables and the aux-rails sheets carry the change, and a freshgen_board.pyrun reproduces the positions.check_netlist/check_footprintspass on both. Fab zips, BOMs and CPLs are regenerated, andbom.py --checkpasses.🤖 Generated with Claude Code