Skip to content

Milestones

List view

  • Enable the platform to automatically recover from known failure scenarios through validation, rollback and remediation workflows. The objective of this milestone is to reduce operational overhead by allowing the platform to detect, diagnose and resolve failures without manual intervention.

    Due by July 2, 2026
  • Detect failures, performance degradation and unexpected runtime conditions before they impact users. The objective of this milestone is to build operational awareness and prepare the platform for automated recovery capabilities.

    Due by July 2, 2026
    1/3 issues closed
  • Make widget lifecycles, deployments and runtime behaviour observable through standard telemetry and tracing technologies. The objective of this milestone is to provide operational visibility into how widgets behave across environments and during deployments.

    Due by June 25, 2026
  • Introduce automated validation of widgets and deployment workflows through end-to-end testing. The objective of this milestone is to increase deployment confidence by ensuring every deployment is automatically verified before release.

    Due by June 18, 2026
    0/2 issues closed
  • Ensure deployments contain only valid configurations and compatible assets before reaching target environments. The objective of this milestone is to prevent invalid contracts, missing assets and environment mismatches from reaching production systems.

    No due date
    1/2 issues closed
  • Establish a reliable deployment platform capable of deploying widgets and contracts to multiple environments with minimal manual intervention. The objective of this milestone is to reduce deployment friction and move towards a one-click deployment experience.

    Due by June 25, 2026
    3/3 issues closed