Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Add sbr job to run system-tests using the medik8s operator image
#85310 opened Sep 16, 2026 by abrugaro Contributor Loading…
[hp-org-pulse]: add repository settings approved Indicates a PR has been approved by an approver from all required OWNERS files. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85309 opened Sep 16, 2026 by JGiola Loading…
medik8s/system-tests: use Go 1.27 builder image as build_root approved Indicates a PR has been approved by an approver from all required OWNERS files.
#85308 opened Sep 16, 2026 by jmontleon Contributor Loading…
remove all medik8s prow jobs except for system-tests approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85307 opened Sep 16, 2026 by weshayutin Contributor Loading…
Using an image with certificates for ldap connection approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#85306 opened Sep 16, 2026 by hector-vido Contributor Loading…
fix:add DisableClusterImagePolicySignatureEnforcement func def back approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#85304 opened Sep 16, 2026 by shakyav Contributor Loading…
[DEBUG][DO NOT MERGE] approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#85303 opened Sep 16, 2026 by tbuskey Contributor Loading…
prow: remove jira/valid-bug requirement for k8s-prometheus-adapter 4.15+ approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85301 opened Sep 16, 2026 by redhat-chai-bot Contributor Loading…
NO-ISSUE: chore(ci): sync quay/quay config (quay#7202) jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#85298 opened Sep 16, 2026 by quay-devel Contributor Loading…
ci(quay): let the mailpit and jaeger steps own their Quay config approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#85297 opened Sep 16, 2026 by jbpratt Contributor Loading…
ARO HCP: pin CAPZ DEV slot-manager location approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#85295 opened Sep 16, 2026 by roivaz Contributor Loading…
chore: add bots as trusted in the stolostron org approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85294 opened Sep 16, 2026 by dhaiducek Contributor Loading…
PROJQUAY-5850: ci: add shared QE STS test steps do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85292 opened Sep 16, 2026 by sudipshil9862 Draft
hack/secret-manager: always pull the latest container image rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85291 opened Sep 16, 2026 by redhat-chai-bot Contributor Loading…
Fix relevant auto run e2e-aws-ci-tests for release-4.12 to release-4.18 versions lgtm Indicates that a PR is ready to be merged.
#85290 opened Sep 16, 2026 by tavital Contributor Loading…
Switch CLO 6.0 to Vector v0.47.0 do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#85289 opened Sep 16, 2026 by vparfonov Contributor Loading…
NO-JIRA: add vault operator CRD approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#85287 opened Sep 16, 2026 by tjungblu Contributor Loading…
ci: enable ARO HCP sweeper tags approved Indicates a PR has been approved by an approver from all required OWNERS files.
#85286 opened Sep 16, 2026 by marek-veber Contributor Loading…
[PERFSCALE-5825] Enable Regulus Dataplane Testsuite on existing BM CPT Lab for Telco Core RDS approved Indicates a PR has been approved by an approver from all required OWNERS files. network-access-rehearsals-ok rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85284 opened Sep 16, 2026 by sraviteja-maker Contributor Loading…
Add azure-stack-ipi-install-f28 install/destroy job for OCP 5.0 rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85283 opened Sep 16, 2026 by mdeore Loading…
Add generic oape-ci-monitor step-registry and must-gather pilot
#85282 opened Sep 16, 2026 by PillaiManish Member Loading…
4 tasks
bind cluster-secrets-devsandboxci-aws collection to devsandbox-aws ro… rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#85281 opened Sep 16, 2026 by jrosental Contributor Loading…
Enable AWS Spot Instances for PTP Operator operator-e2e CI tests approved Indicates a PR has been approved by an approver from all required OWNERS files.
#85280 opened Sep 16, 2026 by nocturnalastro Contributor Loading…
coreos/rhel-coreos-config: specify pull credentials namespace approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#85279 opened Sep 16, 2026 by Roshan-R Contributor Loading…
DNM: nvidia-ci doca2 base-cluster deploy, pinned to openshift-dpf#395 do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#85277 opened Sep 16, 2026 by yoren-rh Loading…
ProTip! Adding no:label will show everything without a label.