Skip to content

Implement TimeLength TerminationCondition #15

@fgrosse

Description

@fgrosse

It would be nice if one could specify a maximum time that a simulation may run.
Absolute and relative time values should both be possible:

Examples:

  • optimization can run at most 60 seconds
  • optimization can run at most 1 hour
  • optimization can run at most 2 days
  • optimization can run at most 1.5 weeks
  • optimization should not run no later than today 19:00
  • optimization should not run no later than 03.07.2012

The TerminationCondition interface should be implemented.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions